09/04/2026
Ask estimators what actually eats their week and it's rarely the estimating itself 🙀
It's a lot of work like reading through every incoming drawing, pulling dimensions by hand, checking material prices and redoing the math when a quantity changes.
Then typing the same numbers into a second system before the quote even goes out...
None of that needs their judgment, all of it needs their time.
Swipe through for the 5 things we think estimators should stop doing manually, it's part of why we built MindPal 💁