Kirby South East Asia

Kirby South East Asia Head Office: 199 Dien Bien Phu, Quarter 46, Gia Dinh Ward, Ho Chi Minh City, Vietnam. Email: [email protected]
Website: kirbysoutheastasia.com

Kirby International, established in 1976, is a global leader in the design and fabrication of pre-engineered steel buildings and structures, offering its customers a wide range of customized and cost-effective steel building solutions. Kirbyโ€™s global spread extends across Middle East, Africa, Asia, Indian subcontinent and South East Asia with production capacity exceeding 400,000 MT annually, oper

ations across 70 countries and workforce of more than 4,000 employees. Kirby globally offers one of the most comprehensive product portfolio ranging from pre-engineered steel building, structural steel to storage solutions. We offer a wide range of steel solutions tailored to meet our customersโ€™ specific needs including pre-engineering steel buildings, storage solutions, industrial racking systems, and broad array of our steel building products that cover applications such as heavy industry, infrastructure, high-rise buildings, warehouse, factories, oil and gas and leisure structures. KIRBY SOUTH EAST ASIA

Kirby South East Asia is doing business since 1999 and started its operation in Vietnam in 2008, with a 50,000 MT annum capacity. Kirby South East Asia has supplied and built over 650 buildings in Vietnam, Australia, Bangladesh, South East Asia and African markets.

๐€ ๐’๐ญ๐ซ๐จ๐ง๐ ๐ž๐ซ ๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐’๐ญ๐š๐ซ๐ญ๐ฌ ๐ฐ๐ข๐ญ๐ก ๐š ๐’๐ญ๐ซ๐จ๐ง๐ ๐ž๐ซ ๐“๐ž๐š๐ฆAt Kirby, ๐ฉ๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐œ๐ž๐ซ๐ญ๐š๐ข๐ง๐ญ๐ฒ starts with the people behind every project.Ou...
21/08/2026

๐€ ๐’๐ญ๐ซ๐จ๐ง๐ ๐ž๐ซ ๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐’๐ญ๐š๐ซ๐ญ๐ฌ ๐ฐ๐ข๐ญ๐ก ๐š ๐’๐ญ๐ซ๐จ๐ง๐ ๐ž๐ซ ๐“๐ž๐š๐ฆ

At Kirby, ๐ฉ๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐œ๐ž๐ซ๐ญ๐š๐ข๐ง๐ญ๐ฒ starts with the people behind every project.

Our annual health check-up is one of the ways we support the wellbeing of our people, from our office teams to our colleagues on the factory floor.

Through regular health screening, we encourage our employees to stay informed about their health and take care of themselves, so they can continue doing what they do best.

Because every strong project is built by a strong team.

๐๐‘๐Ž๐‰๐„๐‚๐“ ๐‚๐„๐‘๐“๐€๐ˆ๐๐“๐˜๐‚๐ž๐ซ๐ญ๐š๐ข๐ง๐ญ๐ฒ ๐’๐ญ๐š๐ซ๐ญ๐ฌ ๐๐ž๐Ÿ๐จ๐ซ๐ž ๐…๐š๐›๐ซ๐ข๐œ๐š๐ญ๐ข๐จ๐ง.Before steel reaches the fabrication floor, engineering has already...
19/08/2026

๐๐‘๐Ž๐‰๐„๐‚๐“ ๐‚๐„๐‘๐“๐€๐ˆ๐๐“๐˜

๐‚๐ž๐ซ๐ญ๐š๐ข๐ง๐ญ๐ฒ ๐’๐ญ๐š๐ซ๐ญ๐ฌ ๐๐ž๐Ÿ๐จ๐ซ๐ž ๐…๐š๐›๐ซ๐ข๐œ๐š๐ญ๐ข๐จ๐ง.

Before steel reaches the fabrication floor, engineering has already set the direction for the project.

Design. Detailing. Coordination. Specifications.

Getting these right early can help ๐ซ๐ž๐๐ฎ๐œ๐ž ๐ซ๐ž๐ฐ๐จ๐ซ๐ค, ๐๐ž๐ฅ๐š๐ฒ๐ฌ, ๐š๐ง๐ ๐ฎ๐ง๐ž๐ฑ๐ฉ๐ž๐œ๐ญ๐ž๐ ๐œ๐ก๐š๐ฅ๐ฅ๐ž๐ง๐ ๐ž๐ฌ later.

Thatโ€™s why Engineering is the first pillar of Project Certainty.

๐Ÿ”ง Design & Detailing

๐Ÿค Coordination

๐Ÿ“ Design Optimization

๐Ÿ” Quality & Compliance

๐‘๐ข๐ ๐ก๐ญ ๐ž๐ง๐ ๐ข๐ง๐ž๐ž๐ซ๐ข๐ง๐ . ๐‘๐ข๐ ๐ก๐ญ ๐ฌ๐ญ๐š๐ซ๐ญ.

๐Ÿ“ฉ [email protected]

๐๐‘๐Ž๐‰๐„๐‚๐“ ๐‚๐Ž๐Œ๐๐‹๐„๐“๐„๐ƒ | ๐„๐ฅ๐ž๐œ๐ญ๐ซ๐ข๐œ๐š๐ฅ ๐„๐ช๐ฎ๐ข๐ฉ๐ฆ๐ž๐ง๐ญ ๐Œ๐š๐ง๐ฎ๐Ÿ๐š๐œ๐ญ๐ฎ๐ซ๐ข๐ง๐  ๐…๐š๐œ๐ข๐ฅ๐ข๐ญ๐ฒ๐Ÿ“ Baliwag, Bulacan, Philippines๐Ÿ“ 1,500 sqmFrom engineerin...
18/08/2026

๐๐‘๐Ž๐‰๐„๐‚๐“ ๐‚๐Ž๐Œ๐๐‹๐„๐“๐„๐ƒ | ๐„๐ฅ๐ž๐œ๐ญ๐ซ๐ข๐œ๐š๐ฅ ๐„๐ช๐ฎ๐ข๐ฉ๐ฆ๐ž๐ง๐ญ ๐Œ๐š๐ง๐ฎ๐Ÿ๐š๐œ๐ญ๐ฎ๐ซ๐ข๐ง๐  ๐…๐š๐œ๐ข๐ฅ๐ข๐ญ๐ฒ

๐Ÿ“ Baliwag, Bulacan, Philippines

๐Ÿ“ 1,500 sqm

From engineering to fabrication and delivery, Kirby Building Systems supports industrial projects with reliable steel building solutions.

๐Ÿ“ฉ Contact us: [email protected]

๐Ÿš€ ๐–๐„โ€™๐‘๐„ ๐‡๐ˆ๐‘๐ˆ๐๐† | ๐‰๐Ž๐ˆ๐ ๐Š๐ˆ๐‘๐๐˜ ๐’๐„๐€Kirby South East Asia is growing - and weโ€™re looking for talented people to join our team...
14/08/2026

๐Ÿš€ ๐–๐„โ€™๐‘๐„ ๐‡๐ˆ๐‘๐ˆ๐๐† | ๐‰๐Ž๐ˆ๐ ๐Š๐ˆ๐‘๐๐˜ ๐’๐„๐€

Kirby South East Asia is growing - and weโ€™re looking for talented people to join our team across Vietnam and the Philippines.

๐Ÿ“ ๐•๐ข๐ž๐ญ๐ง๐š๐ฆ

โ€ข Sr. Planning Engineer / Planning Engineer - D**g Nai & HCMC

โ€ข Design Engineer - HCMC

๐Ÿ“ ๐๐ก๐ข๐ฅ๐ข๐ฉ๐ฉ๐ข๐ง๐ž๐ฌ

โ€ข Sales Engineer - Manila

โ€ข Sales Engineer - Davao

โ€ข Sales Engineer - Cebu

โ€ข CMD Engineer - Davao

Whether youโ€™re an experienced professional or looking to take the next step in your engineering or technical sales career, there may be an opportunity for you at Kirby.

Build your career. Build with Kirby.

๐Ÿ‘‰ Apply Today: [email protected]

๐•๐ข๐ž๐ญ๐ง๐š๐ฆ'๐ฌ ๐ง๐ž๐ฑ๐ญ ๐ฆ๐š๐ง๐ฎ๐Ÿ๐š๐œ๐ญ๐ฎ๐ซ๐ข๐ง๐  ๐ฐ๐š๐ฏ๐ž ๐ข๐ฌ ๐š๐ฅ๐ซ๐ž๐š๐๐ฒ ๐ญ๐š๐ค๐ข๐ง๐  ๐ฌ๐ก๐š๐ฉ๐ž.H1 2026 tells an interesting story:๐Ÿ“ˆ US$34.65B registered FDI๐Ÿญ...
13/08/2026

๐•๐ข๐ž๐ญ๐ง๐š๐ฆ'๐ฌ ๐ง๐ž๐ฑ๐ญ ๐ฆ๐š๐ง๐ฎ๐Ÿ๐š๐œ๐ญ๐ฎ๐ซ๐ข๐ง๐  ๐ฐ๐š๐ฏ๐ž ๐ข๐ฌ ๐š๐ฅ๐ซ๐ž๐š๐๐ฒ ๐ญ๐š๐ค๐ข๐ง๐  ๐ฌ๐ก๐š๐ฉ๐ž.

H1 2026 tells an interesting story:

๐Ÿ“ˆ US$34.65B registered FDI
๐Ÿญ 61.9% of newly registered capital went to manufacturing & processing
๐Ÿ’ฐ 82.6% of realized FDI went to manufacturing & processing
๐Ÿ—๏ธ Southern industrial land absorption jumped 125% YoY

But growth also brings complexity.

๐‡๐จ๐ฐ ๐๐จ ๐ข๐ง๐๐ฎ๐ฌ๐ญ๐ซ๐ข๐š๐ฅ ๐ฉ๐ซ๐จ๐ฃ๐ž๐œ๐ญ๐ฌ ๐ฌ๐ญ๐š๐ฒ ๐ฉ๐ซ๐ž๐๐ข๐œ๐ญ๐š๐›๐ฅ๐ž ๐š๐ฌ ๐ข๐ง๐ฏ๐ž๐ฌ๐ญ๐ฆ๐ž๐ง๐ญ, ๐œ๐š๐ฉ๐š๐œ๐ข๐ญ๐ฒ ๐š๐ง๐ ๐ฌ๐ฎ๐ฉ๐ฉ๐ฅ๐ฒ ๐œ๐ก๐š๐ข๐ง๐ฌ ๐›๐ž๐œ๐จ๐ฆ๐ž ๐ฆ๐จ๐ซ๐ž ๐œ๐จ๐ฆ๐ฉ๐ฅ๐ž๐ฑ?

That's where ๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐‚๐ž๐ซ๐ญ๐š๐ข๐ง๐ญ๐ฒ matters.

Swipe through to see what's driving Vietnam's manufacturing wave, and what it could mean for industrial development.

๐Ÿ‘‰ Follow Kirby for more industry insights across the world.



๐‘†๐‘œ๐‘ข๐‘Ÿ๐‘๐‘’๐‘ : ๐‘๐‘Ž๐‘ก๐‘–๐‘œ๐‘›๐‘Ž๐‘™ ๐‘†๐‘ก๐‘Ž๐‘ก๐‘–๐‘ ๐‘ก๐‘–๐‘๐‘  ๐‘‚๐‘“๐‘“๐‘–๐‘๐‘’ ๐‘œ๐‘“ ๐‘‰๐‘–๐‘’๐‘ก๐‘›๐‘Ž๐‘š / ๐‘‡โ„Ž๐‘’ ๐ผ๐‘›๐‘ฃ๐‘’๐‘ ๐‘ก๐‘œ๐‘Ÿ; ๐ถ๐ต๐‘…๐ธ ๐‘‰๐‘–๐‘’๐‘ก๐‘›๐‘Ž๐‘š; ๐‘‰๐‘›๐ธ๐‘๐‘œ๐‘›๐‘œ๐‘š๐‘ฆ/๐ถ๐ต๐‘…๐ธ; ๐ธ๐‘ข๐‘Ÿ๐‘œ๐ถโ„Ž๐‘Ž๐‘š.

Congratulations to Manila Water on the completion of the East Bay Phase 2 Water Supply System Project! ๐Ÿ‘Weโ€™re proud to h...
13/08/2026

Congratulations to Manila Water on the completion of the East Bay Phase 2 Water Supply System Project! ๐Ÿ‘

Weโ€™re proud to have contributed to this important project, which will strengthen water security and expand water treatment capacity for communities in the East Zone.

Projects like this demonstrate the importance of strong engineering, reliable ex*****on, and collaboration in delivering critical infrastructure that makes a lasting impact.

Congratulations to the entire project team on this achievement! ๐Ÿ’ง๐Ÿ—๏ธ

๐–๐ก๐š๐ญ ๐ข๐ฌ ๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐‚๐ž๐ซ๐ญ๐š๐ข๐ง๐ญ๐ฒ?Every construction project comes with uncertainty.Design changes.Coordination gaps.Material de...
12/08/2026

๐–๐ก๐š๐ญ ๐ข๐ฌ ๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐‚๐ž๐ซ๐ญ๐š๐ข๐ง๐ญ๐ฒ?

Every construction project comes with uncertainty.

Design changes.
Coordination gaps.
Material delays.
Site challenges.

The goal isnโ€™t to eliminate every challenge.
๐ˆ๐ญโ€™๐ฌ ๐ญ๐จ ๐ฆ๐š๐ง๐š๐ ๐ž ๐ฎ๐ง๐œ๐ž๐ซ๐ญ๐š๐ข๐ง๐ญ๐ฒ ๐›๐ž๐Ÿ๐จ๐ซ๐ž ๐ข๐ญ ๐›๐ž๐œ๐จ๐ฆ๐ž๐ฌ ๐š ๐›๐ข๐ ๐ ๐ž๐ซ ๐ซ๐ข๐ฌ๐ค.
With ๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐‚๐ž๐ซ๐ญ๐š๐ข๐ง๐ญ๐ฒ, ๐Š๐ข๐ซ๐›๐ฒ connects four critical areas:

๐Ÿ”ง Engineering
๐Ÿ“‹ Project Management
๐Ÿญ Fabrication
๐Ÿ—๏ธ Site Ex*****on Support

๐‹๐ž๐ฌ๐ฌ ๐ฎ๐ง๐œ๐ž๐ซ๐ญ๐š๐ข๐ง๐ญ๐ฒ. ๐Œ๐จ๐ซ๐ž ๐œ๐จ๐ง๐Ÿ๐ข๐๐ž๐ง๐œ๐ž.
Swipe through to discover what Project Certainty means.

๐Ÿ“ฉ [email protected]



---

Project Certainty โ€“ Sแปฑ ฤแบฃm Bแบฃo Cho Dแปฑ รn Lร  Gรฌ?

Mแปi dแปฑ รกn xรขy dแปฑng ฤ‘แปu phแบฃi ฤ‘แป‘i mแบทt vแป›i nhแปฏng yแบฟu tแป‘ khรดng chแบฏc chแบฏn:

โ€ข Thay ฤ‘แป•i thiแบฟt kแบฟ.
โ€ข Thiแบฟu phแป‘i hแปฃp ฤ‘แป“ng bแป™.
โ€ข Chแบญm trแป… vแบญt tฦฐ.
โ€ข Thรกch thแปฉc thแปฑc tแบฟ tแบกi cรดng trฦฐแปng.

Mแปฅc tiรชu khรดng phแบฃi lร  loแบกi bแป hoร n toร n mแปi thรกch thแปฉc, mร  lร  kiแปƒm soรกt rแปงi ro trฦฐแป›c khi chรบng trแปŸ nรชn nghiรชm trแปng hฦกn.

Vแป›i ฤ‘แป‹nh hฦฐแป›ng Project Certainty, Kirby kแบฟt nแป‘i ฤ‘แป“ng bแป™ 4 lฤฉnh vแปฑc cแป‘t lรตi:

๐Ÿ”ง Engineering โ€“ Thiแบฟt kแบฟ Kแปน thuแบญt
๐Ÿ“‹ Project Management โ€“ Quแบฃn lรฝ Dแปฑ รกn
๐Ÿญ Fabrication โ€“ Gia cรดng Chแบฟ tแบกo
๐Ÿ—๏ธ Site Ex*****on Support โ€“ Hแป— trแปฃ Thi cรดng tแบกi Cรดng trฦฐแปng

Giแบฃm thiแปƒu rแปงi ro. Tฤƒng cฦฐแปng niแปm tin.

๐Ÿ‘‰ Vuแป‘t sang ฤ‘แปƒ khรกm phรก รฝ nghฤฉa cแปงa Project Certainty ฤ‘แป‘i vแป›i dแปฑ รกn cแปงa bแบกn!

๐Ÿ“ฉ [email protected]

It's the Final Day of MBAM OneBuild 2026!We're ready for another day of meaningful conversations and look forward to wel...
07/08/2026

It's the Final Day of MBAM OneBuild 2026!

We're ready for another day of meaningful conversations and look forward to welcoming more visitors to the Kirby Building Systems booth.

If you're attending MBAM OneBuild 2026 today, this is your last opportunity to meet our team and explore how our Pre-Engineered Building (PEB) and Structural Steel Solutions help deliver industrial facilities, warehouses, manufacturing plants, logistics hubs, and commercial buildings with greater speed, quality, and certainty.

Whether you're planning a new project or looking for a trusted partner across Southeast Asia, we'd be delighted to connect.

๐Ÿ“… Today โ€“ 7 August 2026
๐Ÿ“ Kuala Lumpur Convention Centre, Malaysia
๐Ÿ“Œ Booth 1A73

Come by Booth 1A73 before the exhibition closesโ€”we'd love to meet you!

Day 2 at MBAM OneBuild 2026!Another great day of connecting with developers, consultants, EPC contractors, and industria...
06/08/2026

Day 2 at MBAM OneBuild 2026!

Another great day of connecting with developers, consultants, EPC contractors, and industrial owners across the region.

We've had valuable conversations about Pre-Engineered Building (PEB) and Structural Steel Solutions for warehouses, manufacturing plants, logistics hubs, commercial buildings, and other industrial facilities. It's encouraging to see the industry's continued focus on delivering projects faster, smarter, and with greater certainty.

If you're attending MBAM OneBuild 2026 today, we'd be delighted to meet you and discuss how Kirby Building Systems can support your next project across Southeast Asia.

๐Ÿ“… 5โ€“7 August 2026
๐Ÿ“ Kuala Lumpur Convention Centre, Malaysia
๐Ÿ“Œ Booth 1A73

Stop by our booth - we look forward to seeing you!

Address

199 Dien Bien Phu, Ward 46, Gia Dinh Ward
Ho Chi Minh City

Opening Hours

Monday 08:00 - 17:30
Tuesday 08:00 - 17:30
Wednesday 08:00 - 17:30
Thursday 08:00 - 17:30
Friday 08:00 - 17:30
Saturday 08:00 - 17:30

Alerts

Be the first to know and let us send you an email when Kirby South East Asia posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Kirby South East Asia:

Shortcuts

Share